佳礼资讯网

 找回密码
 注册

ADVERTISEMENT

楼主: PS3FAN2005

古晋城的建设与发展资讯 2005~2020 [首页目录更新:2月28日]

[复制链接]
 楼主| 发表于 22-6-2005 02:27 PM | 显示全部楼层
在州立法议会会议中,黄顺舸提出建立轻快铁的交通方案,以便解决交通拥挤问题。

回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 22-6-2005 02:32 PM | 显示全部楼层
aHJin0823 于 22-6-2005 01:28 PM  说 :
Ur ppl really damm amazing...where u ppl get all this information??
But, why all tht project are at kuching?? how about the other places??likes sibu...bintutu..sarikei...miri..or....
im de electr ...

你好,欢迎加入砂州论坛,但请你使用中文发言,如自身电脑没有中文输入系统,可应用佳礼论坛提供的免费中文输入法:http://chinese.cari.com.my/ime/

此帖子是古晋发展转属区,其它城区发展境况可以游览此地:
美里:http://chinese.cari.com.my/myfor ... =272110&fpage=2
诗巫:http://chinese.cari.com.my/myfor ... =294492&fpage=3

有空可以多爬文下,相信你会得到更多发展资讯的收获。
回复

使用道具 举报

发表于 22-6-2005 11:09 PM | 显示全部楼层
樓主,你就是我的古晉發展播報員
謝啦~
回复

使用道具 举报

发表于 23-6-2005 01:22 AM | 显示全部楼层
今天的星洲引黄顺舸的话说,古晋考虑建轻快铁。
回复

使用道具 举报

 楼主| 发表于 23-6-2005 02:46 PM | 显示全部楼层
【州立法议会会议】陈康南:本州半导体业务表现,将会比去年更令人鼓舞



  (古晋22日讯)虽然国际市场仍然面对半导体市场的困境,但是副首席部长兼工业发展部丹斯里拿督阿玛陈康南医生相信本州在今年的业务表现将会比去年更令人鼓舞。



  他说,本州在亚洲、欧洲及美国一带的市场已经打开,更掌握智慧卡、扫描器、自动化加工方面的市场。同时,数玛相机、手提电话、手握电话等的智慧卡都是用第一矽的圆晶品。



  第一矽的业务与运作表现取得巨大改善,营业额从也从2001年的2500万令吉提升到2004年的2亿8000万令吉。

  可以看到的,第一矽所生产的圆晶品是一个策略性的工业领域,这个领域将中国、台湾、新加坡、南韩联系一起,造就了亚洲四小龙地位。

  也是农业现代化部长的丹斯里拿督阿玛陈康南医生是于今日进行部长总结时所说。

  这些国家的政府也投资数十亿美元来推展及进行半导体工业方面的研究。这是一项资金密集的工业。在开始时可能会面对很多问题,甚至出现负债。

  随着三马拉汉工业区的开拓,许多外流在国外的本州电子精英份子都会回流,同时也吸引了许多享誉国际的电子公司前来设厂。



  他说,目前的第一矽员工中,85%是砂拉越公民,同时也在公司内掌握要职。其中最少有20名本地工程师参与晶片设计工作,这是一项十分先进的工业半导体一环。

  他有信心,第一矽将会茁壮成长,同时也会带动更多的外资进来砂拉越。

  州政府在招揽外资进军本州高科技工业方面也是不遗余力的,单是在今年,在首席部长的率领下,成功组织了两个招商团到中国的山东和德国,同时也签署多份备忘录。

  他指出,一些来自中国和德国的财团也会在近期到来砂拉越,进行熟悉性的访问,为前来投资踏出第一步。

  此外,州政府也参与全国的贸易代表团到美国、韩国、日本和香港等地区展开招商活动,反映也是令人鼓舞。



  对本州中小型工业表现不满意

  在中小型工业发展上,也是农业现代化部长的丹斯里拿督阿玛陈康南医生说,中小型工业发展在本州的工业发展上扮演重要的角色,但是,政府对他们的表现还是不满意,并希望他们把生产力提升到一个更高的水平。

  他说,许多的中小型工业还是处于较下游的加工业,例如木基与食品加工业,希望业者能够致力向上线提升。

  实际上,他说,州与联邦政府有为他们提供诸多奖掖,但遗憾的是许多本地的中小型工业却没有掌握良机,例如在技术发展基金方面,只有66家公司在第八个大马计划下获得批准,与西马456家比较,差距太大。而在市场与咨询贷款基金方面,本州也只有24家成功申请,西马则有2980家。

  有鉴于此,他表示,工业部将会在州内各主要市镇展开巡回讲座会,提升本地中小型业者的意识,以便能够获取政府的援助而自我提升。

  他也鼓励中小型工业与外国中小型工业进行联营合作,此举不但能够吸引外国资金,也能够达致技术转移的目标。

  在砂拉越的竞争能力方面,无可否认,高昂的运输费削弱了本州的竞争能力。本州的出口主要是经过新加坡或巴生港口而转运的。因此,他认为有必要提升这方面的后勤服务。

  与此同时,州内主要道路也必须获得提升,以便降低运输费用。州政府将寻求联邦的协助,提供本地业者运输上的奖掖。

  联邦政府目前正探讨将民都鲁海港发展为东东合成长区的主要出口海港,从而吸引更多的远洋轮船到来。



新闻转自:国际时报
回复

使用道具 举报

 楼主| 发表于 25-6-2005 06:28 PM | 显示全部楼层
Kuching plans to have own gold museum
  
KUCHING is to have its own gold museum, carved out of an abandoned mine.

  Deputy Minister of Rural and Regional Development, Datuk Dr Tiki Lafe, told reporters in Bau yesterday that the plan to turn an abandoned goldmine into museum is receiving favourable response from the relevant authorities.

  “We are getting the support from Sarawak Museum Department director and Ministry of Tourism and Urbanisation Sarawak - our proposal would be tabled in the next meeting to be held soonest,” Tiki revealed.

  Tiki said they have identified Bukit Young Gold Mine, a large, deep excavation with a horizontal tunnel as the site for the proposed museum.

新闻转自:阳光日报
回复

使用道具 举报

Follow Us
 楼主| 发表于 28-6-2005 02:51 PM | 显示全部楼层
新纳里石油终点站及棕油提炼厂,工程在兴建明年10月完成

  (古晋27日讯)设在古晋新纳里的石油终点站和棕油提炼厂的工程正在兴建中,预料在明年10月完成。

  与此同时,配合此计划,一座油与煤气码头也在赶建中,并将在今年8月建竣。石油终点站和棕油提炼厂及码头工程耗资3亿令吉,是由砂拉越信托证券集团独资发展。

  一座油与煤气码头在赶建中

  首席部长丕显斯里阿都泰益玛目今早见证砂拉越信托证券集团与拉昔胡先银行集团签署贷款协约。

  石油终点站和棕油提炼厂乃古晋市发展大蓝图的两项策略性计划。石油终点站计划是将现有在民达华的石油终点设施迁至更适合地点,即新纳里深水海港毗邻,这将改善周围的环境及居民的安全。

  在棕油提炼厂在古晋投入运作下,将为南砂的约1万8000名小园主、种植业公司与提炼厂每年节省近2000万令吉的运输费。目前,南砂种植业者必耗巨额费用将原棕油和油棕籽运往700公里的民都鲁提炼厂加工。

  石油终点站建筑工程配套是由日本Chioda公司和PPES工程公司联营公司获得,由国油和蚬油负责兴建,棕油提炼厂工程则由砂拉越土地统一与复兴局联合Cargill承包。

  与此同时砂拉越信托证券集团也与古晋海港局在新纳里深水海港合建一座油与煤气码头。

新闻转自:国际时报
回复

使用道具 举报

 楼主| 发表于 28-6-2005 07:31 PM | 显示全部楼层
Makro To Open Seven New Outlets Within Next Three Years

PENANG, June 28 (Bernama) -- Makro Cash & Carry Distribution (M) Sdn Bhd, an international trading company specialized in the distribution of consumer goods, will open seven new outlets in the country in the next three years.

Its managing director, Pieter Boone said the company was waiting for the approval from Domestic Trade and Consumer Affairs Ministry before it could open the two new outlets in Kota Kinabalu, Sabah and Kuching, Sarawak, before the end of the year.

"Seven outlets have been identified to be built in the city areas and two applications have been submitted to the ministry and we are still waiting for the approval," he said.

He was speaking to reporters after witnessing the relaunching of Makro Penang at Sungai Dua, here Tuesday by State Local Government, Traffic Management, Information and Community Affairs Committee chairman, Datuk Dr Teng Hock Nan.

Boone said to date there were eight Makro stores nationwide in Shah Alam, Selayang, Cheras, Johor Bahru, Ipoh, Seremban, Seberang Perai and Sungai Dua in Penang.

He said the cost to build one outlet was about RM8 million and the company had about 620,000 customers holding its trade card in the country.

He added that about 82 percent were active small business customers and retailers, caterers and professionals in the service sector.

Recently, he said Makro introduced a "Gold Card" membership that provided additional privileges and services to recognise and reward its loyal customers.

Besides that following the new store concept, Makro has on display six categories -- the fresh foods, dry groceries, health and beauty, audio and appliances, office supplies and non-food catering needs.

"Our cash and carry business concept, the first of its kind to be introduced in Malaysia, is targeted at small businesses and retailers, caterers and professionals in the service sector," he said.

He said the store re-launch would see changes in the store which would provide customers with a comfortable and hassle free shopping experience.

-- BERNAMA

---------------------------------------------------------------

万客隆3年内增7间 2新地点锁定亚庇古晋

槟城28日讯-万客隆有限公司(Makro)董事经理比尔德文乐指出,该公司计划在未来3 年内在全马增设7间霸级市场。

他今早与槟州行政议员拿督丁福南主持重新设计万客隆霸级市场推介礼后,向传媒发表谈话。

他说,目前全马已拥有8间万客隆霸级市场,他们也计划另增7间霸级市场,以期在全马达到15间万客隆霸级市场。

“新霸级市场的两个地点已鉴定即亚庇与古晋,不过,另5间新市场的地点则未决定。”

他指出,设立一间新的霸级市场大约需要8千万令吉。

全马60万持卡顾客

他说,目前他们全马共有60万名持卡顾客,单单槟城的万客隆霸级市场的顾客就有6万名,而这数目还是每日增加。

另外,丁福南指出,槟城是全马第二小的州属,拥有140万名人口,其中一半人口是居住在槟岛,虽然只是一个小的州属,但,他可以自豪地说,槟城虽小,却是一个贸易与制造业的集中点。

“令人感到欣慰的是,外资来槟城投资不只是制造业,同时也包括零销业,例如万客隆霸级市场,是州内其中一间大型的外资零销公司,该公司是于1996年与2001年,分别在诗布朗再也与槟岛开设霸级市场。”

他说,槟城的两间万客隆市场做得很好,每天提供市民各种需要的日常用品,同时,还聘请160名员工,提供就业机会给市民。

出席者包括万客隆(马)有限公司主席拿督阿都拉阿里。

新闻转自:南洋商报

[ Last edited by PS3FAN2005 on 10-7-2005 at 04:10 PM ]
回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 1-7-2005 01:23 PM | 显示全部楼层
Ngiu Kee to open hypermarts

BY JACK WONG IN KUCHING
NGIU Kee Corp (M) Bhd is on track to expand into the hypermarket business in Sarawak and Sabah.

Chief executive officer Yong Siew Kat said the company was going ahead with a long-term plan to set up hypermarkets in major towns.

Its first hypermarket is scheduled to open for business in Miri this month and the second is targeted for operation in the proposed Samajaya Shopping Mall, Kuching in the middle of next year. The company plans to set up at least one hypermarket a year over the next several years. It has identified Sibu, Bintulu and Kota Kinabalu for its expansion.

Yong said Ngiu Kee had, under a rationalisation exercise, shut down five non-profitable departmentstores/supermarkets, including in Kuching and Miri.

“With these non-profitable outlets closed, we should be on the profitable track,” she added after the company AGM in Kuching yesterday.

The second board-listed retail chain operator posted a pre-tax profit of RM993,000 for the first quarter ended March 31, up from RM464,000 recorded during the same period last year.

Yong said the company was still assessing the impact of its share price collapse. From RM1.48 on May 30, Ngiu Kee's share price had plummeted to 33 sen. It has since recovered and stabilised at around 50 sen.

新闻转自:Malaysia Star
回复

使用道具 举报

 楼主| 发表于 5-7-2005 02:20 PM | 显示全部楼层
Naim starts works on new Btg Balingian Bridge, access road

KUCHING - Work on the new Batang Balingian Bridge have started with the handing over of the site by the Public Works Department (PWD), Sarawak to its turnkey contractor, Naim Cendera Sdn Bhd - the CIDB Builder of the Year 2004 award winning subsidiary of Naim Cen-dera Holdings Bhd (Naim).

Construction of the RM22 million bridge is expected to be completed by 28 June, 2008 while that of the RM13 million access road by 27 June, 2007.

Naim's Senior Technical Advisor, Alan Teng, said that the method to be adopted in the construction of the 276-metre long bridge would be the in-Situ Stitching method.

According to him, the overall length of the two-lane carriageway bridge from one approach to anoth er is 400 metres.

"We have also started work on the 5:8-km long Balingian access road as well, and it is expected to be completed according to schedule," Teng said.

On May 29 last year, Naim delivered on schedule the 13.84-km long Balingian-Kuala Balingian road under Package 1 of the Balingian/ Kuala Balingian/Kuala Tatau/Bintulu Road.

The delivery of both the new Batang Balingian bridge and the access road is expected to be ahead of schedule as Naim has been well associated with timely delivery of its construction projects as evidenced in its recent projects that include the following: The New Batang Kemena Bridge; Bintulu, Access road to Curtin University of Technology Miri; International Go Kart Racing Track Miri; and Upgrading of Sibu-Bintulu Road.

The new Batang Kemena Bridge that runs parallel to the existing one was the first in Malaysia to be completed using the modern Incremental Launching Method (ILM) and is now opened to traffic.

新闻转自:PAMSC
回复

使用道具 举报

 楼主| 发表于 5-7-2005 02:21 PM | 显示全部楼层


PPES Works - Naim Cendera JV awarded contract for construction of the new Sarawak Dewan Undangan Negeri (DUN) complex

Monday, 4 July 2005, Kuching -- PPES Works (Sarawak) Sdn Bhd and its joint-venture partner, Naim Cendera Sdn Bhd, today announced that the JV had received a Letter of Award from the Sarawak Government to design and build the new Sarawak State Legislative Assembly or Dewan Undangan Negeri (DUN) complex in Petra Jaya, Kuching.

The contract for the design, construction and completion of the new DUN complex is valued at RM296.5 million. Construction is targeted for completion in September 2007.

The new DUN complex is part of an overall masterplan covering a 172-acre development at Pangkalan Sapi on the picturesque banks of Sungai Sarawak in Petra Jaya, Kuching.

The design of the new 9-storey State Legislative Assembly building combines unique elements of Sarawak's heritage with state-of-the-art intelligent building automation systems, multimedia communication facilities, and environmentally-friendly features.

With its large legislative hall housed under a distinctive "payung" roof, the new DUN complex located opposite the Kuching Waterfront in the centre of Kuching city is set to become one of the future icons for Sarawak.

PPES Works holds a 55% stake in the joint-venture, whilst the balance 45% is held by Naim Cendera.

新闻转自:CMSB
回复

使用道具 举报

 楼主| 发表于 7-7-2005 02:39 PM | 显示全部楼层
伦乐加央桥今日通车

  (古晋6日讯)人们引颈长盼的伦乐加央桥将在明日通车了。

  第二副首席部长兼乡村发展部及基本设施发展与交通部长拿督巴丁宜丹斯里阿玛阿弗查布将于明早(7月7日,星期四)10时为这座全长415公尺的大桥主持通车礼,为本州的道路桥梁系统掀开新的一页。

  这项消息相信对于伦乐及三马丹民众,以及该道路的使用者来说无疑的是一项大喜讯,因为从此渡轮服务将成为过去,取代及连贯两岸的是一座宏伟坚固的大桥,使到从石角及石隆门通往伦乐及三马丹的交通更趋完善及通行无阻。

  此座耗资1850万令吉的加央大桥,全长415公尺、桥粱宽度9公尺、河中央桥墩高达150公尺,横跨300公尺河宽。

  加央桥的工程原本将于2001年12月16日竣工,但是由于一些技术上及经济不足问题,导致工程进度被拖延。

  据了解,最初承包商是以1730万令吉投标此兴建工程,但是后来经过评估以后,建设工程则需要1850万令吉。因此在经费不足的情况下导致工程被拖延。

  砂州第一干路近年来只剩下伦乐加央及巴南芦仙两座桥梁尚未完成,使到这两个路段的交通必须依靠渡轮服务来引渡,对道路使用者造成诸多不便,特别是周末假期,这两个地方都是排满长龙,道路使用者往往要苦候多时才能够渡河。

  如今,经过多次展延的伦乐加央桥如今已经成功通车,就只剩下巴南芦仙大桥而已了,相信该大桥在获得联邦公共工程局直接监督与管理后,相信能够在今年底完成。

  一旦芦仙大桥工程完成后,泛婆大道的衔接更臻完善,公众人士将可从三马丹驱车直达林梦,一路通行无阻。

新闻转自:国际时报
回复

使用道具 举报

 楼主| 发表于 7-7-2005 02:40 PM | 显示全部楼层
提升扩建10哩猪笼草公园,成为旅游重点区

  (古晋6日讯)座落于10哩的猪笼草公园现已正如火如荼的进行有关的提升及扩建设施工程,以望将该公园塑造成为旅游的重点区之一。

  该耗资80万令吉以提升及扩建占地半英亩的猪笼草公园,预计将于明年在大马第9计划的拨款下,完成整个的工程计划。

  巴达旺市议会主席陈如飞是在出席今日的一个移交仪式上如是指出。

  他表示,猪笼草公园的第一期耗资20万令吉的工程已在进行之中,预计四个月内将会竣工。

  然而,后期将陆续进行人造湖、瀑布、喷水池、凉亭、美化灯及行人跑道等等设施工程。

  他还指出,该园内同时拥有37种类的猪笼草及30多种类的野胡姬花,然而此时亦正值胡姬绽放盛季,他呼吁民众们万勿错过此难得欣赏百花争艳的情景。

  猪笼草公园的开放时间为每星期二至星期日,早上9时至下午4时,星期一为休息日,收费则为成人1令吉,小孩60仙,外国旅客2令吉。。

  同时,他亦透露,该园为配合巴达旺节,特於日前免费开放三天予民众参观,并吸引了约6千位民众的游历,这已突显了其的发展潜力。

  此外,他指出,猪笼草公园已被列入为巴达旺生态旅游景点之一,然而该区亦同时拥有包括十二哩实蒙谷猿人中心、安娜来长屋及婆罗洲高原三个生态旅游景点。

  如欲知更多详情,可致电巴达旺市议会热线082-615566询问。

新闻转自:国际时报
回复

使用道具 举报

 楼主| 发表于 8-7-2005 03:31 PM | 显示全部楼层
黄国忠:未来两年?建15层综合大厦



●综合大厦蓝图。

2005年3月3日



??综合大厦估计将耗资4000至5000万令吉,将是古晋中华工商总会重要的硬体发展计划。
●黄国忠:15层综合大厦,是古晋中华工商总会重要硬体发展目标。

??古晋中华工商总会会长黄国忠于3月3日表示,在古晋毕打那路兴建15层综合大厦,将是该会未来两年的重要硬体发展目标。

??黄国忠会长在一项新闻发布会上针对商会的未来发展计划作出这项表示时说,基于这是一项耗资庞大的计划,因此不可能在未来的两年内完成。

??他指出,大厦的蓝图已获得批准,但地段上的木屋问题则在去年11月间才获得圆满解决,产业小组正与各有关方面洽商,探讨应通过何种方式来推行这项计划,包括选择合作的发展机构,一旦作出决定,计划便可推行。

新闻转自:国际时报
回复

使用道具 举报

发表于 8-7-2005 11:08 PM | 显示全部楼层
PS3FAN2005 于 20-6-2005 09:57 PM  说 :
古晋发达了!!!说大点就是砂州发达了!
自电子公司1st Silicon投资在古晋以来,一直为这里赚钱,真是给古晋带来了更多的发展及就业机会。


其实1st Silicon根本不曾赚过钱,是一个贴钱的公司。从开业到现在,已经亏了大概25亿令吉。但很奇怪的是他们员工的工资都蛮高的,例如我有一个堂哥在里面做engineer,专门去国外帮忙公司评估引擎,他的薪水大概有RM7000,看他也蛮轻松的。他说还有员工的薪水比他的高,例如里面一些韩国人的薪水大概有RM10000左右。哗~羡慕死了~~~
回复

使用道具 举报

发表于 9-7-2005 02:11 PM | 显示全部楼层
DaVinci 于 8-7-2005 11:08 PM  说 :


其实1st Silicon根本不曾赚过钱,是一个贴钱的公司。从开业到现在,已经亏了大概25亿令吉。但很奇怪的是他们员工的工资都蛮高的,例如我有一个堂哥在里面做engineer,专门去国外帮忙公司评估引擎,他的薪水大 ...

其实这不算什么。Petronas 的员工薪水更高。我同事的朋友的月薪是 RM105,000!! 才28岁!!
回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 9-7-2005 03:00 PM | 显示全部楼层
耗资4亿已完成50%,砂国际医药中心07年建竣

  (古晋8日讯)耗资4亿令吉的砂拉越国际医药中心工程目前已经完成50巴仙,预料将于2007年全面建竣。

  首席部长丕显斯里泰益玛目指出,一旦砂拉越国际医药中心投入服务后,将能够为本州甚至亚洲区域人民的医药中心。

  他说,经过多年的策划后,此座医药中心已在两年前开始施工,预料将于2007年全面完工。

  这是他今日出席古晋诺玛医药专科中心荣获由大马健康素质协会所颁发的“表扬证书”仪式后,在所召开的一项记者会招待会上所透露的消息。这项证书的有效期为三年,即从2005年3月10日直至2008年3月9日。

  他也相信,一旦该座砂拉越国际医药中心建竣后除能够吸引外流的医学人才回流外,也能够吸引海外专才前来本州就业。

新闻转自:国际时报
回复

使用道具 举报

 楼主| 发表于 9-7-2005 03:01 PM | 显示全部楼层
砂大新校园将於今年10月开始启用

(古晋8日讯)马来西亚砂拉越大学(UNIMAS,简称砂大)永久校园的第一期工程已施工近95%,并预计将於今年10月开始启用。

砂大校长阿都拉昔阿都拉教授表示,第一期新校园基本上已将近竣工,而目前承包商正在进行收拾工程手尾的事项。

“新校园的第一期工程目前已施工了95%左右,且很快便会进行内部装修工程、包括搬进家私及办公室工具等,预计这一切将於今年10月完成,届时新校园便可开始启用。”

他强调,在新校园启用后,并非该大学所有的科系及研究中心都将搬迁到新校园内运作,只有在那些在第一期的工程下获得兴建专用建筑物的科系才会进行搬迁,馀下的将仍旧在现有的校园运作 。

“一些科系、如经济系、社会科学系及部份的医学系专用建筑物将会在第二期工程中兴建。”

同时,他说,在新校园启用后,砂大当局并不会一次过把全部的师生全都迁移到有关的新学园,而是会以分批的方式,来让师生们陆续迁移到新校园中。

“新校园在启用后,砂大当局还要进行一些安排工作,所以,师生们必须以分批的方式来迁移到新校园,而我们预计需要3个月的时间来完成迁移工作。”

有鉴於此,他指出,砂大的新校园预计必须到了今年杪或1月初,才能全面地启用。

阿都拉昔阿都拉是於今日出席砂大2005/2006学年新生宣誓遵守大学生行为准则的仪式后,向报界如此表示。

在谈到砂大永久校园第二期工程时,他表示,该期工程将在第九大马计划(2006-2010年)下动工,而兴建工程预料将於明年、即第九大马开始实行的首年施工兴建,并预计将在第九大马计划将近尾声时竣工。

据他表示,砂大永久校园第一期和第二期的校地,约地1千英亩,另有1千英亩来供兴建休闲及举办活动的建筑物,因此,整个校园共占地2千英亩左右。

阿都拉昔阿都拉说,第一期工程竣工后,新校园将能容纳1万名的学生,而第二期工程完工后,整个砂大能容纳1万4千名之多的学生。

他补充,在新校园启用后,砂大医学系座落在砂拉越中央医院旁的建筑物仍会继续使用,因为该建筑物属於医学系的永久建筑物。

新闻转自:星洲日报
回复

使用道具 举报

 楼主| 发表于 13-7-2005 02:08 PM | 显示全部楼层
古晋与昆明今年底将缔结友好城市

  (古晋12日讯)古晋市与中国的昆明市缔结为“友好城市”的意愿,将可以在今年底落实。

  古晋南市市长田承凯州议员今天受访作出这项表示时说,中国昆明市市长预定在今年9月间带领一支友好访问团前来古晋访问。古晋南市市政局希望两市缔结为“友好城市”的文件,能在昆明市友好访问团前来古晋访问时在古晋正式签署。

  马中建交另一突破

  一旦这份文件正式签署,古晋将是我国第一个与中国城市缔结为“友好城市”的城市。这将能更有效的促进马中两国的联系,尤其是两国人民的友谊,也是两国自1974年正式全面建交後的另一项重大突破。

  田承凯市长指出,两个不同国家的城市缔结为“友好城市”必须符合一些条件,在各领域必须拥有良好的联系与交流,在教育上也是如此,这将为我国的学子在中国开拓更宽广的升学之路。

  古晋市与昆明市缔结为“友好城市”的意愿,源起于去年年杪本州第一副首席部长丹斯里拿督阿玛陈康南医生带领一支访问团前往昆明访问时,两市均有这方面的强烈意愿。之後,两市便致力推动这方面的工作,而一切的工作也均在顺利的开展之中。

  昆明是中国云南省省会,是云南省政治、经济、文化中心,是中国西南地区重要的城市之一,也是中国通往东南亚、南亚的重要枢纽。

  昆明市处在云贵高原中部,面积2.11万平方公里。昆明原为古代定居在滇池一带的民族族称,后作为地名沿袭至今。境内最高点在禄劝县轿子山马鬃岭,海拔4274米,最低点在东川区小江与金沙江交汇处,海拔695米,市区海拨为1891米。

  昆明属干湿分明的亚热带高原季风气候,素有“春城”之美誉。独特的气候,使昆明一年四季植物茂盛、花开艳丽,花卉品种达到400多种。

新闻转自:国际时报
回复

使用道具 举报

 楼主| 发表于 13-7-2005 02:15 PM | 显示全部楼层
MAS planning another fair next year

FOLLOWING the overwhelming response to the recent Malaysia Airlines Travel Fair, Malaysia Airlines (MAS) plans to organise another fair early next year.

MAS Penang district manager Wan Mohd Ebrahem Wan Hasnan said the event might be held at the Penang Inter-national Sports Arena in Relau in the first quarter of the year.

“We are now in the early stages of planning,” he said, adding that MAS hoped to attract a bigger market at the upcoming fair.

He said this after handing over a RM16,000 cheque to National Cancer Society of Malaysia, Penang branch vice chairman Datuk Dr T. Devaraj at the MAS corporate office yesterday.

The amount donated was from the RM2 gate collection of the travel fair in Penang, he said, adding that the event attracted 8,000 people.



Wan Mohd Ebrahem(left)presenting a mock cheque to Dr Devaraj.

The MAS travel fair was held simultaneously in Pe-nang, Kuala Lumpur, Kuching and Kota Kinabalu.  

Wan Ebrahem said the travel fairs in all four locations garnered a staggering RM115mil in sales, exceeding the national carrier's earlier target of RM100mil.

A total of RM111.7mil, he said, was recorded from the sales of tickets and Golden Holiday packages, while the airline's Internet booking facility (IBF) recorded a RM3.3mil sale.

Wan Ebrahem said the fair, the brainchild of MAS managing director Datuk Ahmad Fuaad Dahlan was to reward loyal customers with value deals for their air travel and vacations.

“It is also a platform for MAS' business partners to promote their value-added products and services directly to customers,” he said.

To a question, Wan Ebra-hem said the London bombing did not affect MAS' transit flight from London to Kuala Lumpur via Penang.

“There is no drop in the number of passengers,” he said, adding that the transit flight was scheduled every Wednesday and Sunday.

新闻转自:The Star Online
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 8-5-2024 06:49 AM , Processed in 0.068461 second(s), 20 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表