从 2th August, TUN DR LIM CHONG EU EXPRESSWAY 将会关闭 for 1 年。
我要晕 了。 到时上下班会更塞。。。。。
############
FREPENCA Circular No. 16.2014
Dear Members,
CLOSURE OF A SECTION OF TUN DR. LIM CHONG EU EXPRESSWAY
We have been informed by MPPP that a section of Tun Dr. Lim Chong Eu Expressway will be closed from 2 August 2014 for a period of 1 year for the widening of the bridge on Sungai
Tiram. The affected area of the Expressway is between the junction with Medan Bayan Lepas
and the junction with Hilir Sungai Keluang 1.
The traffic arrangement is as follows:-
1. Traffic from Batu Maung to George Town will not be affected.
2. Traffic from George Town to Batu Maung will be diverted into Hilir Sungai
Keluang 1, Lintang Bayan Lepas, Medan Bayan Lepas and then turn right
into the Expressway.
Traffic lights will be installed at the junction of Medan Bayan Lepas and the Expressway.
Pending the installation of the traffic lights, traffic from Batu Maung to George Town will be
diverted into Medan Bayan Lepas, Lintang Bayan Lepas and Hilir Sungai Keluang 1 except
during the peak periods (7 a.m. to 9 a.m. and 5 p.m. to 7 p.m.) whereby the Police will station
its personnel to control the movement of traffic.
Kindly let us have your feedback or concerns regarding the above traffic arrangement.
Yours faithfully,
THE FREE INDUSTRIAL ZONE, PENANG, COMPANIES' ASSOCIATION
KENNEDY BURKILL & COMPANY BERHAD
Secretaries & Treasurers
CHING NENG SHYAN