【本刊梁志华撰述】新加坡《商业时报》(Business Times)在上周四的一篇报道中揭露,联昌国际银行(CIMB Bank)正式接管与巫统关系密切的一家私人公司——亚洲石油中心私人有限公司(Asia Petroleum Hub Sdn Bhd),因为这家私人公司耗尽联昌国际银行提供的14亿元贷款,却无能完成亚洲石油中心发展项目,还打算向外筹资20亿元来填补深不见底的开支黑洞。


亚洲石油中心(Asia Petroleum Hub)是一项坐落在柔佛州依斯干达经济特区范围的丹绒滨填土岛屿(靠近丹绒巴勒巴斯,Tanjung Pelepas)的大型发展计划。按照原定计划,这项总值马币14亿元的发展项目,是一项拥有多个码头的综合型港口设施,有能力处理大小规模的油槽船只,每年可应付3000艘船只,以及3000万吨的石油产品。

根据负责这项发展项目的亚洲石油中心私人有限公司,在2007年7月发表的一份文告显示,这个项目原本预计在2009年完工,可是时至今日,相关工程只完成不到65%,而14亿元的资金已经全部耗尽。

亚洲石油中心的整个发展成本,主要是依赖联昌国际银行所提供的融资便利。根据《商业时报》引述知情人士的消息指出,联昌国际银行是在2006年向亚洲石油中心私人有限公司发出总额14亿元,为期三年的过渡性贷款(bridge loan)。

成本超支至少20亿元

据了解,亚洲石油中心私人有限公司在2009年已提出其中的8亿4000万元,来支付相关项目的成本开支。不过,相关项目的成本飙升,导致亚洲石油中心的发展成本已超出原本预算的14亿元。

消息指出,截至2010年杪,亚洲石油中心的累积资本开支(包括贷款利息)已经超出14亿元,但相关工程计划只完成了64%。基于所筹资金不足以应付开支,亚洲石油中心私人有限公司打算寻找投资者,额外注资20亿元,来填补看不见底的开支黑洞。

一项原本14亿元的发展项目,不但在耗尽14亿元资金的情况下无法完成,还要另外寻找20亿元的注资来填补成本,反映出相关计划至少面对高达142%(或20亿元)的成本超支问题。

基本上,马来西亚政府推动的经济发展项目出现成本超支问题,已经形成一种常态,尤其是由官联公司(GLCs)或者那些与巫统或国阵政府关系密切的寻租人所负责的发展项目,更是成本超支方面的“专家”。

“超支成本”化身为寻租管道

在这个寻租框架下,这些被任意挥霍的“超支成本”,往往通过发展项目的掩饰,利用各种管道和方式,流入既得利益者的口袋,当中包括政党、机构、商家企业,以及个体户。

这是国阵政府(尤其是以巫统为核心的政府结构)执政五十多年来的典型“恩庇政治”(Political Patronage)下的必然产物,通过政府国库或政府控制的金融机构作为后盾,来支撑朋党企业经济利益的一个寻租框架。

正因为有政府作后台,往往对获得大型发展项目的寻租人形成一种“大得不能倒”(Too big to Fail)的道德风险,寻租人才会毫无节制的挥霍,因为他们相信,政府最终会出手拯救,这也注定了很多大型发展项目,最终都以失败收场。

亚洲石油中心发展项目,本身就是一个充满恩庇政治色彩的典型寻租游戏,整个发展项目环绕在一群与最大执政党巫统关系密切的寻租人身上。

一场巫统恩庇政治的寻租游戏

这项发展项目的拥有者——亚洲石油中心私人有限公司,原本是由KIC石油天然气集团 (KIC Oil & Gas Group of Companies,简称KIC集团)和巫统(UMNO)控制的一家私人公司——Trek Perintis私人有限公司共同持有,KIC集团拥有90%股权,而Trek Perintis则持有剩余的10%股权。

KIC集团是马来西亚一家港口终站私人营运业者,手中持有的业务包括位于丹绒巴勒巴斯港口的岸外浮动型燃油处理终站,以及位于巴生港口(西港)的货运终站。KIC 集团的创办人是阿都拉昔(Abdul Rashid Mohd Isa Al-Qadiry)和法依德占(Faidzan Hassan Al-Qadiry),两人是这家集团的大股东。

Trek Perintis是由前首相阿都拉掌舵时代的巫统总财政——阿都阿金(Abdul Azim Zabidi)掌管的一家巫统代理公司。阿都阿金在阿都拉时代获委托,负责管理巫统旗下的资产。

KIC集团主吹的慈善信托基金会——Al-wariseen信托,获得当时担任首相的阿都拉撑场,成为这个信托基金的顾问。同时,阿都拉的前政治秘书,目前是巫青团宣传主任的理查(Reezal Merican Naina Merican),也出现在该信托基金的信托人董事局名单中。

重组股权结构纳入寻租人

不过,根据《新海峡时报》(New Straits Times)在2007年9月14日的一篇报道中显示,亚洲石油中心私人有限公司在进行一轮新的股权结构重组后,KIC集团在这家公司的股权从原本的90%减持至40%,而另一大股东Trek Perintis的股权则从原本的10%提高至20%。

同时,另外两家公司,即Seaport Terminal私人有限公司和Teori Selatan私人有限公司则崛起,成为亚洲石油中心私人有限公司的两个新大股东,分别持有35%和5%股权。

Seaport Terminal是被视为巫统经济利益代理人的著名土著企业家——赛莫达(Syed Mokhtar Al-Bukhary,左图)所拥有的一家私人公司。这家公司是丹绒巴勒巴斯港口的拥有人兼营运者。

至于Teori Selatan则是由当时还是柔佛州王储的东姑依布拉欣(Tunku Ibrahim Ismail,现任柔佛州苏丹)控制的一家私人公司。

简单来说,KIC集团从亚洲石油中心私人有限公司的股权减持行动中,把50%的股权“分配”给柔佛州皇室、巫统,还有与巫统关系密切的赛莫达。

承包商与巫统关系密切

与此同时,这项发展项目的承包工程方面,也涉及不少与巫统关系非常密切的承包商。资料显示,这项计划的承包商名单包括ZAQ Construction私人有限公司、Mott MacDonald有限公司、南发机构(Nam Fatt Corporation Bhd)、肯嘉纳石油(Kencana Petroleum Bhd)、睦兴旺工程(Muhibbah Engineering Bhd),以及Qi-PMC私人有限公司。

亚洲石油中心私人有限公司是整个发展项目的总承包商,而ZAQ Construction则是执行承包商(Managing Contractor),负责委任与颁发亚洲石油中心项目下的工程计划给二手承包商。

ZAQ Construction的老板兼董事再纳(Zainal Rafique)与另一名董事查马尼(Zamani Rafique)之间是兄弟关系。他们的另一名兄弟——Zul Rafique & Partners律师事务所创办人祖吉菲(Zulkifly Rafique)是首相纳吉的亲信之一。纳吉在上任后对党资产进行大重组,把所有巫统资产合并纳入Temasek Padu旗下,并委任祖吉菲负责看守这家公司。

Qi-PMC私人有限公司与ZAQ Construction之间拥有同样的股东结构,而ZAQ Construction的董事查马尼,也是Qi-PMC的董事之一。

值得注意的是,在前首相阿都拉时代担任联邦直辖区部长的祖哈斯南(Zulhasnan Rafique),也是祖吉菲等人的兄弟。祖哈斯南被视为是阿都拉重用的亲信之一。

至于南发机构、肯嘉纳石油,以及睦兴旺工程,则是这项计划的二手承包商。其中,肯嘉纳石油是前首相马哈迪的儿子莫扎尼(Mokhzani Mahathir)所拥有的一家上市公司。

二手承包商成为受害者

从亚洲石油中心发展项目的后期局势发展来看,当中不少二手承包商在一定程度上,成了这宗大型发展项目金融丑闻的受害者。

其中,因亚洲石油中心遭联昌国际银行集团接管,而受到牵连的二手承包商睦兴旺工程,在近期接受《路透社》询问时就透露,截至2010年杪,该公司在这项计划下被拖欠的建筑工程款项高达3亿7080万元。

此外,另一家二手承包商南发机构在今年1月18日正式通过仲裁庭,向首要承包商ZAQ Construction提出法律诉讼,向后者追讨所拖欠的款项,以及所蒙受的损失。据了解,ZAQ Construction一共颁发两项合约给南发机构,其一是总值2亿零280万元的采购合约;其二是总值3亿4750万元的建筑工程合约。

根据南发机构的文告,截至去年杪为止,ZAQ Construction在采购合约上,还拖欠该公司1740万5998元的款项。至于建筑合约方面,南发机构遭拖欠2162万零376元的账单(包括已采购项目和已完成的工程建筑部分)。该公司还向ZAQ Construction追讨6586万3265元的亏损赔偿。

14亿元消失无踪?

按照这两家二手承包商被拖欠的款项来计算,目前为止,亚洲石油中心发展项目至少拖欠承包商高达马币4亿元的工程采购与建筑费用(不包括承包商的亏损索偿)。一项获得联昌国际银行提供14亿元贷款的发展项目,为何无法支付拖欠承包商的4亿元欠款呢?

这笔原本应该用来支付建筑工程开支的14亿元,究竟是因为建筑成本飙升而被耗尽,还是流入寻租人的口袋,至今仍是一个谜。

目前唯一可以肯定的是,这项计划至今还未完成(估计只完成了64%),接下来还需要消耗更多的资金,才能让这项发展项目顺利完成。根据媒体报道,这项计划估计需要额外20亿元的投资才足以应付建筑成本需要。然而,其关键问题在于,这20亿元是否真的可以填补深不见底的开支黑洞?


回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 23-6-2011 09:08 PM | 显示全部楼层
可以吃到那么明显,佩服!!!

幸好Iskandar的发展很大程度上是由私人界带动,不然。。。
回复

使用道具 举报

发表于 23-6-2011 10:07 PM | 显示全部楼层
回复 201# hauzi302


    嘩,到底這種爛公司浪費了我們國家多少銀子啊???!!!!!!!!!!他x的!!!!!!!
回复

使用道具 举报

发表于 24-6-2011 10:46 AM | 显示全部楼层
  大馬
依斯干達特區成功吸引外資
2011-06-24 09:32

(吉隆坡24日訊)依斯干達投資公司(II B)在柔佛依斯干達特區的發展計劃,目前仍在如火如荼的進行,並趕上原定進度,雖然發展計劃尚未完工,但該公司已成功吸引到來自中國及印度等國家的企業前來投資。

依斯干達投資公司主席兼首席執行員拿督賽莫哈末指出,該公司在特區內的發展工程趕上進度,他們已吸引到來自中國、印度及香港等國家和地區的企業前來投資。
回复

使用道具 举报

发表于 24-6-2011 11:43 AM | 显示全部楼层
可以吃到那么明显,佩服!!!

幸好Iskandar的发展很大程度上是由私人界带动,不然。。。
bujua 发表于 23-6-2011 09:08 PM

是吧,你看这些狗阵的人多么脏,祈祷这种project最好在iskandar越少越好

不过还好iskandar还是以外资为大多数,还有房产业,最重要的还是educity,全部都是外国投资商
回复

使用道具 举报

 楼主| 发表于 24-6-2011 07:16 PM | 显示全部楼层
本帖最后由 bujua 于 24-6-2011 07:20 PM 编辑

Growing interest in Iskandar
Friday June 24, 2011
http://biz.thestar.com.my/news/s ... 964141&sec=business
KUALA LUMPUR: More regional and national investors are showing interest in Iskandar Investment Bhd’s (IIB) landbank in Nusajaya.

President and CEO Datuk Syed Mohamed Ibrahim said at a press briefing here that there might be some ground-breaking deals in the next two to six months to the tune of RM1bil.

Several Bursa-listed, Chinese, Indian and Hong Kong developers are in different stages of negotiation. A Chinese investor, with Chinese Development Bank financing, is negotiating to build a four to five-star hotel with a gross development value of RM400mil in Medini North, near Legoland.

A renowned Indian resort developer plans to build a low density premium resort in Medini South while a Hong Kong developer is negotiationg to enter a joint-venture development to build mixed residential and commercial developments. This Hong Kong project is still in the preliminary stage.

“We expect interest to pick up as we go along,” Syed Mohamed said, adding that local developers were also considering having projects in Nusajaya.

IIB has close to 4046.9ha in Nusajaya, with Medini taking about 902.5ha.

The thrust of the work done by IIB thus far includes Medini itself which is located between the two causeways leading to Singapore. Themepark Legoland is part of Medini while Educity comprises a further 123.4ha, and Marlborough College 36.4ha.

Medini infrastructures, Legoland the themepark and education-related projects are the three main catalytic projects executed by IIB, which is 60% owned by Khazanah Nasional Bhd, while the Employees Provident Fund and Kumpulan Prasarana Rakyat Johor each has a 20% stake. IIB is responsible for bringing investments into Johor’s Iskandar Malaysia.

Syed Mohamed said another parcel would be carved out for education, currently known as Educity II. The interest in education has also resulted in Raffles University setting up campus in Johor.
回复

使用道具 举报

Follow Us
发表于 25-6-2011 12:03 AM | 显示全部楼层

Iska

本帖最后由 CarUrHead 于 25-6-2011 12:29 AM 编辑

这个标题把Iskandar讲到像是一个神地。。这几年来要不是有反对党在吉隆坡和槟城的造势,屋价的起伏也不会这样大,要是只依靠国阵来发展Iskandar Johor, 那是不够的。。几年后你会发现很多现在刚买屋子的所还银行利息还多过你买的屋价,就后赚到的也只是发展商和银行吧了,刚投资Iskandar Johor 屋的人须谨慎。。
回复

使用道具 举报

 楼主| 发表于 25-6-2011 02:44 AM | 显示全部楼层
这个标题把Iskandar讲到像是一个神地。。这几年来要不是有反对党在吉隆坡和槟城的造势,屋价的起伏也不会这 ...
CarUrHead 发表于 25-6-2011 12:03 AM



    谢谢你的分享.... 我相信这里的每一个理智的投资者都不会把Iskandar看成"圣地", 投资者看到的是成为"圣地"的潜能, 跟它现在像不像"圣地"是两回事,没人可以预测得到将来...

近年的屋价大起, 不只是大马的事, 而是全亚洲都在起,然到我们的反对党也在其它国家造势吗???

楼上也有提到,Iskandar的发展很大程度上靠的是私人与外资的推动,政府只负责吸引外资...

我不会惊讶几年后的利息会多过房价,所以几年后的房价也许会更高....

我个人其实蛮喜欢看到反对的意见,几年后到回来看,时间就可以证明一切...
回复

使用道具 举报


ADVERTISEMENT

 楼主| 发表于 27-6-2011 11:37 PM | 显示全部楼层
签字&confirmed, 不再是说说而已。。。

S'pore-Johor rapid transit link by 2018
Posted: 27 June 2011 1751 hrs
http://www.channelnewsasia.com/s ... iew/1137439/1/.html


SINGAPORE: The Singapore and Malaysian governments plan to open a rapid transit link between the city-state and the neighbouring city of Johor Bahru in Malaysia's south by 2018, both governments said in a joint statement on Monday.

"The terminating stations of the (rapid transit system) link will be in the vicinity of JB Sentral, Johor Bahru and in the vicinity of Republic Polytechnic, Singapore," the statement said.

"It is targeted that the RTS link will be operational by 2018. The RTS link will have a co-located (customs, immigration and quarantine) facility in Singapore and another co-located CIQ facility in Johor Bahru so that commuters need to clear immigration only once for each way of travel."

The announcement comes as Malaysia and Singapore officially sealed the Points of Agreement (POA) on Malayan railway land in Singapore.

The signing ceremony took place in Putrajaya, Malaysia on Monday.

Foreign Minister K Shanmugam signed on behalf of Singapore while Malaysia's side was represented by the Minister in the Prime Minister's Department, Nor Mohamed Yakcop.

The signing officially marks an end to year-long negotiations on implementation details that kickstarted following the landmark announcement of the POA breakthrough by the prime ministers of both countries in May 2010.

The joint statement by the prime ministers of Singapore and Malaysia said that preparations for the relocation of Keretapi Tanah Melayu (KTM) from Tanjong Pagar to the Woodlands Train Checkpoint on July 1 are on track.

A joint venture company, called M+S Pte Ltd, and Iskandar JV Company will be established by Thursday.

M+S will develop the four land parcels in Marina South as an integrated development and the two land parcels in Ophir-Rochor, also as an integrated development.

Iskandar JV will undertake two wellness developments in Iskandar Malaysia.

In addition, Khazanah and Temasek will jointly consider other potential developments which are commercially viable in Iskandar Malaysia of up to 500 acres of land, inclusive of the said 215 acres.

Also on schedule is the implementation of the work plan to hand over the waterworks under the 1961 Water Agreement by Singapore free of charge and as a matter of goodwill after the expiry of the agreement on 31 August 2011.

Malaysian Prime Minister Najib Razak and Singapore Prime Minister Lee Hsien Loong expressed appreciation and satisfaction on the work done by the ministers and officials in achieving the historic breakthrough in the POA.

Both prime ministers also reiterated their commitments towards further strengthening bilateral relations.

They noted that the resolution of the POA would pave the way for the two countries to explore new areas of cooperation.
回复

使用道具 举报

 楼主| 发表于 27-6-2011 11:44 PM | 显示全部楼层
Singapore, Malaysia formalise land swap deal
By Channel NewsAsia's Malaysia Bureau Chief Melissa Goh | Posted: 27 June 2011 2001 hrs
http://www.channelnewsasia.com/s ... iew/1137468/1/.html

PUTRAJAYA: Malaysia and Singapore have officially sealed the Points of Agreement (POA) on Malayan railway land in Singapore.

This heralds a new era in bilateral cooperation that includes the development of a rapid transit system and iconic wellness projects in southern Malaysia.

The historic signing on Monday officially marks an end to year-long negotiations on implementation details that kickstarted after the landmark announcement of the POA breakthrough by the prime ministers of both countries in May 2010.

At a short ceremony in Putrajaya, Malaysia was represented by Minister in the Prime Minister's Department Nor Mohamed Yakcop, while newly-appointed Foreign Affairs Minister K Shanmugam signed on behalf of Singapore.

The mood was jovial between the ministers and they expressed optimism that the signing will usher in a new era in bilateral cooperation.

Mr Nor Mohamed said: "It's a very happy day. It's a new beginning for us in cooperation in attracting investment. It's excellent for both countries. We are confident this is a new beginning for good cooperation and plenty of investments. Certainly, not only Iskandar will do well but the whole of Malaysia will do well because of confidence factor in attracting foreign investment.''

Mr K Shanmugam said: ''It really takes the relationship to a different level. It's win-win....for both countries and promises much more. In that sense, in every sense, it's historic moment.''

Already, Singapore's investments in the southern economic region of Iskandar have tripled to over US$1.2 billion since May last year.

Under the land swap arrangement in the written instrument signed on Monday, Malaysia was given four parcels of land in Marina South and two more in Ophir-Rochor in exchange for giving up Malayan railway land in Singapore.

A 60-40 joint venture company, called M+S Private Limited, will be set up between Malaysia's Khazanah and Singapore's Temasek to undertake the development of the land parcels in Singapore.

Another 50-50 joint venture company will be set up to develop two iconic wellness projects in Iskandar Malaysia.

Mr K Shanmugam said: "This is a very substantial commitment, this is the first 215 acres; also, don't forget the projects in Singapore which are going to be (worth) billions (of dollars); it's a very significant start.''

Under the agreement, both countries also undertake to improve connectivity by expanding the rapid transit system (RTS) from Singapore to Johor Bahru by 2018.

A joint technical group is targeting to call the tender for a consultancy study on the RTS link by the fourth quarter of 2011.

Malaysia and Singapore are also working towards resolving their differences over whether development charges are payable on three parcels of railway land in Tanjong Pagar, Kranji and Woodlands. This has been referred to the Permanent Court of Arbitration.

Separately, as a gesture of goodwill, Singapore will be handing over the waterworks to Malaysia free of charge and in good working order after the expiry of the 1961 Water Agreement. A ceremony will be held to mark the event on 31 August this year.
回复

使用道具 举报

发表于 28-6-2011 10:04 AM | 显示全部楼层
iskandar malaysia的最新发展报告

http://www.jackphanginvestment.c ... andar-malaysia.html
回复

使用道具 举报

 楼主| 发表于 28-6-2011 12:02 PM | 显示全部楼层
看来MRT East-West line, 只extend到Tuas而已,不会cross border...可惜!!不过也大大减短johor-spore的来回时间。。。

Next stop for MRT stations: Second Link
27 Aug 2010
Line part of forked Tuas extension from East-West line

THE MRT will be extended to the Second Link by 2015.


The Straits Times understands the line will be part of the East-West Line’s forked Tuas extension – a 14km above-ground stretch on which work could start in the second half of next year, and be completed in 2015.

The branch leading to the Second Link will be completed first, with the other branch leading to the factories in Tuas South to follow, said sources.

Engineering drawings done last year show the line continuing westwards from Joo Koon station towards the Second Link, with four stops along the way.

The plans call for a rail viaduct rising 20m above ground, about twice the height of current elevated MRT tracks. This, an MRT first, will take the track above the Ayer Rajah Expressway/Pan-Island Expressway intersection.

At some point, the rail viaduct will run along a road viaduct – another first.

The Transport Ministry said alignment of the extension has not been finalised, but confirmed that a stop will be sited near the Second Link.

It ruled out extending the East-West line to Johor from the Second Link station.

Plans for a cross-border metro extension, to be ready in 2018, were announced in May by Prime Minister Lee Hsien Loong and his Malaysian counterpart, Datuk Seri Najib Razak.

But observers say that because plans are for the extension to stop at Tanjung Puteri in Johor Baru, the line across is likely to be launched from the Woodlands station, not the Second Link.

Industry watchers said having an MRT line to the Second Link is crucial, even if it is not extended across the border.

Dr Lim Wee Kiak, who chairs the Government Parliamentary Committee for Transport, said the Second Link station offers commuters an alternative if the Causeway checkpoint gets too crowded.

For Resorts World Sentosa (RWS) spokesman Robin Goh, having an MRT station at the Second Link – and as soon as 2015 – may well translate into more Malaysian customers visiting the resort, principally, its casino.

He said a station there will attract more free-and-independent travellers, who now make up about half of the visitors to RWS. As it is, 20 to 30 bus-loads of Malaysians now go there on an average weekday, ‘and a bit more on weekends’, he said.

Sources said the Second Link stop could also be a train depot for future MRT lines that connect to the East-West line’s western tip.

Transport researcher Lee Der Horng of the National University of Singapore said, however, that to maximise the potential of a station at the Second Link, it will be critical to provide connectivity on both sides, ‘so travellers will not end up in the middle of nowhere’.

On this front, a bus terminal for cross-border services could possibly be sited near the Second Link station.

Mr Sebastian Yap, the spokesman for the Executive Bus Agencies Association, said talks on moving the interstate bus terminal in Lavender Street have been going on for years now.

The recent announcement to set up a Downtown Line station in Jalan Besar has given added impetus to move the bus terminal out, given that the urban development around the station will need to be maximised.

But Mr Yap thinks Tuas is not the ideal new location.

Saying the association preferred Boon Lay, he said: ‘A good terminal service is all about connectivity. Besides the MRT, we need taxis as well as public buses.’

Those working in Tuas are thrilled at the prospect of an MRT extension there.

Mr Mike Leong, a 30-year-old Malaysian who works at Daimler’s logistics centre in Tuas and spends four hours each work day travelling between home in Johor’s Gelang Patah and his workplace, is looking forward to a shorter commute.

Packed buses ferrying Malaysians enter Singapore via the Second Link daily and head for the Jurong East MRT station, from where company buses pick them up and drive them westwards again to Tuas. It is a circuitous trip which Mr Leong thinks ‘wastes a lot of time’.

Raffles Country Club vice-president Lek Seow Yam said an MRT extension to Tuas would make it easier for businesses there to fill positions.

He said: ‘It can be difficult to find people who want to work in Tuas because of the distance. An MRT line would also encourage more people to patronise the F&B places there.’

NUS’ Dr Lee suggested that the Tuas extension could include Nanyang Technological University (NTU).

‘If we can provide an airport extension, I see no reason why the MRT cannot be extended to NTU,’ he added.

Source: Straits Times, 27 Aug 2010
回复

使用道具 举报

 楼主| 发表于 28-6-2011 12:13 PM | 显示全部楼层
Tuas Link MRT Station


Tuas Link MRT Station (EW33) is an elevated Mass Rapid Transit station on the East West Line, under the Tuas MRT Extension project in Singapore. When opened, it will replace Joo Koon as the western terminus of the East West Line.

It was first announced on 11 January 2011 by Transport Minister Mr Raymond Lim in a speech while visiting Bedok MRT Station when new platform screen doors opened there.

To be completed by 2016 and benefit an estimated 100,000 commuters daily, it is expected to be connected to the Second Link and Tuas Bus Terminal, thus having the possibility of having international trans-border services en-routing to terminate at the bus terminal instead of the current Jurong East Bus Interchange.

Trains can head straight to the Tuas West Depot after the station.

The livery of the station may be green.

http://www.sgwiki.com/wiki/Tuas_Link_MRT_Station
回复

使用道具 举报

发表于 28-6-2011 02:47 PM | 显示全部楼层
时机未到。幸好从我家到2nd link 和 causeway都差不多距离。无所谓。。
回复

使用道具 举报

 楼主| 发表于 28-6-2011 04:18 PM | 显示全部楼层
时机未到。幸好从我家到2nd link 和 causeway都差不多距离。无所谓。。
jackphang 发表于 28-6-2011 02:47 PM



    我也认为时机未到。。。但很明显2nd link 的MRT是可以通的。。。
回复

使用道具 举报

发表于 28-6-2011 05:17 PM | 显示全部楼层
http://www.zaobao.com.sg/sp/sp110628_009.shtml


新马关系 淡马锡与马国库控股 成立两家联营公司两地投资

(2011-06-28)

早报导读

[中国早点] 国民教育与自游行
[新马关系] 新马关系迈入新纪元
[中国政情] 中国地方债务存隐患
[台海局势] 上海昨仍未接自由行通行证审批通知
[全球金融风暴] 希腊力争周内通过财政紧缩新案
● 游润恬 郭丽娟 报道
  新加坡和马来西亚双边关系继续强化,两国政府也将携手合作在柔佛海峡两岸同时进行房地产战略性投资。

  我国淡马锡控股公司与马来西亚国库控股(Khazanah)昨晚联合发表文告宣布成立两家联营公司,分别发展在新加坡和马国依士干达特区(Iskandar Malaysia)的综合发展项目。

  淡马锡控股与国库控股的这两项合作计划是李显龙总理和马国首相纳吉于去年5月举行会谈时所达成的协议。

  由淡马锡控股占40%股权,国库控股占60%股权的马新私人有限公司(M+S Pte Ltd,之前称为M-S Pte Ltd),将共同开发位于新加坡滨海南新市区及奥菲亚-梧槽路的六块优质地段。

  位于滨海南的四块地将用于发展综合项目,联营公司已委任国库控股的间接独资子公司马友乃德置地( UEM Land)和淡马锡控股间接独资子公司丰树投资(Mapletree Investments)联合负责项目的发展和行销。

  至于奥菲亚-梧槽的两块地则将发展另一综合项目。这个项目的发展及行销则由马友乃德置地和淡马锡控股另一间接独资子公司嘉德置地(CapitaLand)负责。

  这两个发展项目将建有办公楼、住宅、酒店和零售商店等,可建筑面积约50万1020平方米,总发展价值(gross development value)高达110亿新元。

  与此同时,淡马锡控股与国库控股也将成立各占50%股权的联营公司Pulau Indah Ventures,联手在依士干达特区发展两个总值估计约30亿令吉(约12亿新元),可建筑面积达136万5675平方米的商业项目。

  两家公司昨天联合发表文告透露,它们自去年5月起便开始寻找适合发展项目的地段,如今已锁定两块地段,一块在美迪尼北(Medini North),另一块在美迪尼中(Medini Central)的文化遗产区。
新马关系 淡马锡与马国库控股 成立两家联营公司两地投资

(2011-06-28)

早报导读

[中国早点] 国民教育与自游行
[新马关系] 新马关系迈入新纪元
[中国政情] 中国地方债务存隐患
[台海局势] 上海昨仍未接自由行通行证审批通知
[全球金融风暴] 希腊力争周内通过财政紧缩新案
  联营公司有意在这两块地段发展服务公寓和企业培训中心,另外也计划供其他商业、零售、住宅及与保健服务有关行业作发展的用途。
  文告说:“国库控股和淡马锡控股目前正同潜在合作伙伴及不同项目的业者进行讨论与磋商,以充分发挥这个地点的商业潜能。”

  两家公司已在今年第一季度展开相关规划与设计工作,目标是在五年内完成第一阶段的发展。

  美迪尼区的发展概念是把东方文化、历史及建筑风格和最新科技、世界级物流及安全系统结合为一体。美迪尼北的现有项目包括乐高积木乐园(Legoland)、乐高酒店、时尚购物商场和鹰阁美迪尼医院。附近的其他设施包括公主港家庭娱乐中心和教育城等。

  国库控股董事经理阿兹曼·莫达(Azman Hj Mokhtar)说:“国库控股自2006年便开始参与发展依士干达特区,现在淡马锡控股的参与,将极力配合依士干达现有及未来的发展计划,并增加依士干达发展的动力。”

  淡马锡控股执行董事兼首席执行官何晶也对两国的合作项目表示有信心。她说:“我们很幸运能得到马来西亚的马友乃德置地和新加坡的丰树和嘉德置地等主要房地产公司的高度专业的支持。”

  嘉德置地昨晚也发表声明指出,它的首席营运总监林明彦将负责带领几个主要的跨商业部门项目。
回复

使用道具 举报


ADVERTISEMENT

发表于 28-6-2011 10:42 PM | 显示全部楼层
iskandar development area这么大,你们觉得那里可以投资?
会不会成为白象计划?
回复

使用道具 举报

 楼主| 发表于 28-6-2011 10:53 PM | 显示全部楼层
iskandar development area这么大,你们觉得那里可以投资?
会不会成为白象计划?
步惊云大侠 发表于 28-6-2011 10:42 PM



   
步惊云大侠, 如果你把此帖泡完,然后用你的轻功巡游Iskandar几圈,就知道是真是假。。。胜过我在这里车大炮百篇。。。
回复

使用道具 举报

发表于 29-6-2011 11:26 AM | 显示全部楼层
iskandar development area这么大,你们觉得那里可以投资?
会不会成为白象计划?
步惊云大侠 发表于 28-6-2011 10:42 PM

你问的问题,基本上没有人会回答你,因为未来的事情没有人懂;如果你说会不会成为另一个MSC cyberjaya那样,也没有人懂;

可是如果说投资,请问你是指什么的投资?房地产?如果是房地产可能你得等很久,因为新山房产整体来讲“还没有”像KL或者PG那样成熟,如果你要投资也可以,这里有个活着的例子就是我们的jason版主(前提是你也深谙投资道理);

如果说基础建设投资(educity, legoland),投资家全部都是外国投资者,所以你说的白象,他们的risk比你还要大几千倍甚至几万倍到;

如果说政府花钱的地方,大概就是建了N多条路,而且每条都是dual不然就是triple lane;还有新的行政中心(已经建好的了,也最好自己去看);

最后,lz这个贴整10几面全部都是讲iskandar,你如果勤劳一点就自己爬贴,在不然就是自己开车进去iskandar走一走
回复

使用道具 举报

 楼主| 发表于 29-6-2011 12:21 PM | 显示全部楼层
你问的问题,基本上没有人会回答你,因为未来的事情没有人懂;如果你说会不会成为另一个MSC cyberjaya那样 ...
hauzi302 发表于 29-6-2011 11:26 AM



    hauzi302, 读到你这句 "这里有个活着的例子就是我们的jason版主", 我忍不住笑 ,jason看到不懂会不会误解你在“咒“他,你是故意不用“活生生”的吗?你用“活着”是不是别有用心,哈哈。。。开玩笑罢了。。。


jason, 开玩笑罢了。。。
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 注册

本版积分规则

 

ADVERTISEMENT



ADVERTISEMENT



ADVERTISEMENT

ADVERTISEMENT


版权所有 © 1996-2023 Cari Internet Sdn Bhd (483575-W)|IPSERVERONE 提供云主机|广告刊登|关于我们|私隐权|免控|投诉|联络|脸书|佳礼资讯网

GMT+8, 29-3-2024 01:20 PM , Processed in 0.061042 second(s), 20 queries , Gzip On.

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表